Construction site facilities
A number of facilities are required on construction sites to provide adequate welfare for workers. The Construction (Design and Management) Regulations (CDM Regulations) require the provision of:
- Sanitary conveniences.
- Washing facilities.
- Drinking water.
- Changing rooms and lockers.
- Facilities for rest.
For more information see Welfare facilities.
In addition, sites may include other facilities, such as:
- Welcome facilities and entry control.
- Site offices.
- Meeting rooms.
- Training and induction facilities.
- Wheel washing facilities.
- Site canteen.
- Off-loading facilities.
- Laydown area.
- Temporary storage and storage areas.
- Sub-contractor facilities.
- Car parking.
- Waste management and recycling facilities.
- Fabrication facilities.
- Facilities for the construction of mock-ups for testing.
In order that the site can operate efficiently and safely, it is important that these facilities are laid out properly on the site. Site layout planning involves four basic processes:
- Identifying the site facilities that will be required.
- Determining the sizes, and other constraints of those facilities.
- Establishing the inter-relationships between the facilities.
- Optimising the layout of the facilities on the site.
See Site layout plan for more information.
[edit] Related articles on Designing Buildings Wiki
- Attendance.
- CDM planning period.
- Construction phase plan.
- Handover to the contractor.
- Human resource management in construction.
- Laydown area.
- Lighting of construction sites.
- Main construction compound.
- Office manual.
- Pre-construction information.
- Principal contractor.
- Site layout plan.
- Site office.
- Site plan.
- Site storage.
- Sub-contractor.
- Temporary site services.
- Temporary structures
- Temporary works.
- Welfare facilities.
- Wheel washing system.
Featured articles and news
Do you take the lead in a circular construction economy?
Help us develop and expand this wiki as a resource for academia and industry alike.
Warm Homes Plan Workforce Taskforce
Risks of undermining UK’s energy transition due to lack of electrotechnical industry representation, says ECA.
Cost Optimal Domestic Electrification CODE
Modelling retrofits only on costs that directly impact the consumer: upfront cost of equipment, energy costs and maintenance costs.
The Warm Homes Plan details released
What's new and what is not, with industry reactions.
Could AI and VR cause an increase the value of heritage?
The Orange book: 2026 Amendment 4 to BS 7671:2018
ECA welcomes IET and BSI content sign off.
How neural technologies could transform the design future
Enhancing legacy parametric engines, offering novel ways to explore solutions and generate geometry.
Key AI related terms to be aware of
With explanations from the UK government and other bodies.
From QS to further education teacher
Applying real world skills with the next generation.
A guide on how children can use LEGO to mirror real engineering processes.
Data infrastructure for next-generation materials science
Research Data Express to automate data processing and create AI-ready datasets for materials research.
Wired for the Future with ECA; powering skills and progress
ECA South Wales Business Day 2025, a day to remember.
AI for the conservation professional
A level of sophistication previously reserved for science fiction.
Biomass harvested in cycles of less than ten years.
An interview with the new CIAT President
Usman Yaqub BSc (Hons) PCIAT MFPWS.
Cost benefit model report of building safety regime in Wales
Proposed policy option costs for design and construction stage of the new building safety regime in Wales.
Do you receive our free biweekly newsletter?
If not you can sign up to receive it in your mailbox here.